PGOC Problem Sessions
01 - Generator Input Output EDC (Length: 49 min 07 seconds)
02 - EDC using LP (Length: 1hr 09 min 36 seconds)
03 - Transmission losses and LMP (Length: 1hr 15 min 55 seconds)
16 - Interior Point Method and LMP Calc (Length: 1hr 15 min 10 seconds)
17 - State Estimation Introduction (Length: 1hr 20 min 03 seconds)
18 - State Est Calculations (Length: 1hr 16 min 07 seconds)
04 - Unit Commitment using DP (Length: 1hr 16 min 10 seconds)
05 - Unit Commitment using LR (Length: 1hr 14 min 15 seconds)
06 - Fuel Scheduling (Length: 1hr 07 min 43 seconds)
19 - AC State Estimation Applications (Length: 1 hr 15 min 47 seconds)
20 - Automatic Generation Control (Length: 1 hr 19 min 20 seconds)
21 - Power Interchange and Power Pools (Length: 1 hr 18 min 54 seconds)
24 - Power Auction using OPF (Length: 1 hr 20 min 01 seconds)
07 - Hydro Scheduling (Length: 1hr 19 min 10 seconds)
08 - Hydro Scheduling using DP (Length: 46 min 39 seconds)
09 - Power System Security (Length: 1hr 16 min 51 seconds)
22 - Power Auctions (Length: 1 hr 17 min 31 seconds)
23 - Power Markets (Length: 1 hr 16 min 58 seconds)
27 - FTR Auctions (Length: 1 hr 23 min 16 seconds)
10 - Inc Losses and LMP (Length: 1hr 12 min 58 seconds)
11 - Security Analysis (Length: 1hr 17 min 04 seconds)
12 - PTDF and LODF Factors (Length: 1hr 06 min 38 seconds)
25 - Power Market Example (Length: 1 hr 06 min 19 seconds)
26 - Loss Allocation Ancillary Services (Length: 1hr 16 min 33 seconds)
13 - Optimal Power Flow (Length: 1hr 08 min 08 seconds)
14 - LMP and OPF (Length: 1hr 14 min 39 seconds)
15 - DC OPF and AC OPF (Length: 1hr 15 min 24 seconds)